kpw 50 Workshop-manual : Page 172

Microfiches
Image preview

Page 170

Image preview

Page 171

Image preview

Page 173

Image preview

Page 174

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200
          16. CHARGING SYSTEM                                                                   K-PIPE 50

 SERVICE INFORMATION
 GENERAL INSTRUCTIONS
  The battery is a MF battery which needs no refilling of distilled water.
  Do not quick charge the battery. Be sure to use a MF battery charger and the battery temperature
  should not exceed 45.
  Remove the battery from the motorcycle for charging. If the battery must be charged on the
  motorcycle, keep sparks and flames away from a charging battery.
  When inspecting the A.C. generator, use an electric tester.
  Route the charging system wires properly to avoid shorted wire due to wires being twisted or
  kinked.



 SPECIFICATIONS
 Battery capacity                                                 12V6AH
 Electrolyte specific gravity                               1.2601.280 20
 Charging current                                                10A max.
                         Charging rpm                         2,500 rpm (min.)
 A.C. generator
                         Capacity                           1.3A min./6,000 rpm
 Regulator/Rectifier                                        No contact point type
 Charging coil resistance                                        0.20.3


 TORQUE VALUES
 A.C. generator stator bolt
 A.C. generator rotor bolt


 SPECIAL TOOLS
 Flywheel holder
 Flywheel puller

 TESTING INSTRUMENTS
 Kowa electric tester
 Sanwa electric tester




                                                                                           16-2