kpw 50 Workshop-manual : Page 181

Microfiches
Image preview

Page 179

Image preview

Page 180

Image preview

Page 182

Image preview

Page 183

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200
          17. STARTING SYSTEM                                                        K-PIPE 50
                                                   Continuity
 Check for continuity from the cable terminal
 to the brush holder and from the cable
 terminal to the brush.
 Cable terminal and brush holder
 No continuity: normal
 Cable terminal and brush
 Continuity: normal



                                                                No Continuity


 Inspect the brushes for wear or damage.
 Measure the brush length.
 Service limit: 8.5mm

 Inspect the brush springs for wear or fatigue.




                                                           Brush Springs



 INSDTALLATION
 Install a new O-ring and apply oil to it.
 Install the starter motor and tighten the three
 mounting bolts securely.
 Install the ground terminal properly as
f shown with starter motor mounting bolt.
f
fConnect the starter motor connector.
 Install the starter clutch (page ?)
 Install the front cover.




                                                                             17-4