15. BATTERY/CHARGING SYSTEM QUANNON 125 Pulser Coil A.C. Generator Stator A.C. GENERATOR REMOVAL A.C. generator removal ( 10-3) A.C. generator installation ( 10-6) Right Crankcase Cover Bolts Regulator/Rectifier REGULATOR/RECTIFIER INSPECTION Remove the right body cover. Remove the regulator/rectifier wire coupler. Check the continuity between the wire terminals. Normal Direction: Continuity (+) Probe (-) Probe I Yellow Green II Red Yellow Reverse Direction: No Continuity Normal Red (+) Probe (-) Probe Direction I Green Yellow Yellow II Yellow Red Reverse Green Direction VOLTAGE REGULATION TEST Connect a voltmeter across the battery Red terminals. Start the engine and gradually increase the engine speed. The battery terminal voltage should be within 14.015.0V. Voltage Sensor 15-6