12. FRONT WHEEL/SUSPENSION/
STEERING STRYKER 125/150
When installing the right and left handlebar
switch housings. Tighten the two switch
housing screws.
When installing the master cylinder and
clutch lever holders, align the tab on the
holder with the hole in the handlebar with
the holder "UP" mark facing up.
First tighten the upper bolt and then the
lower bolt.
Torque: 1.01.4kg-m
THROTTLE PIPE INSTALLATION Clean Surface
Clean the handlebar surface and install the
throttle pipe. Check the throttle grip for
proper operation.
12-6